ENTSOG TYNDP 2017 - Annex A2 - Project Details
Current TYNDP : TYNDP 2017 - Annex A
Page 66 of 620
NDP and PCI Information
Schedule
Start Date
End Date
Third-Party Access Regime
Part of NDP NDP Number
Pre-Feasibility Feasibility FEED Market Test
Considered TPA Regime Considered Tariff Regime Applied for Exemption
Yes (NDP 2017-2026 (new project))
Regulated Regulated
TRA-N-752
10/2015
06/2018 02/2016
No
Currently PCI
Exemption Granted
No
Not Relevant
Permitting Supply Contracts FID Construction Commissioning
CBCA Decision Market Survey
Exemption in entry direction Exemption in exit direction
No
0.00% 0.00%
Not Relevant (no CBCA decision)
2019
2020
Pipelines and Compressor Stations Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
The project comprises several technical measures, which leads factually to entry capacity increase between DE (Gaspool) and CZ. The incremental capacity represents approx. entry capacity extension between the market areas of DE (Gaspool) and CZ. Total
C4G - DE/CZ
Benefits
Main Driver
Market Demand
Main Driver Explanation Benefit Description
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM