ENTSOG TYNDP 2017 - Annex A2 - Project Details

Current TYNDP : TYNDP 2017 - Annex A

Page 63 of 620

NDP and PCI Information

Schedule

Start Date

End Date

Third-Party Access Regime

Part of NDP NDP Number

Pre-Feasibility Feasibility FEED Market Test

Considered TPA Regime Considered Tariff Regime Applied for Exemption

Yes (NDP 2016-2025)

Regulated Regulated

TRA-N-136

06/2014

02/2017 05/2012 11/2017

No

Currently PCI

Exemption Granted

Yes (6.1.1, 6.1.12)

Not Relevant

Permitting

09/2010

CBCA Decision Market Survey

Exemption in entry direction Exemption in exit direction

Yes (2014-10-17) Other(2012-05-17)

Supply Contracts FID Construction Commissioning

0.00% 0.00%

2019

2019

Pipelines and Compressor Stations Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

The pipeline length at CZ side is approx. 207.4 km (Tvrdonice- +Dģ 8SJUDGH RI WKH H[LVWLQJ FRPSUHVVRU VWDWLRQ %ĝHFODY &= is needed.

7YUGRQLFH &= +Dģ &= 3/

1,000

207

24

Total

207

24

PCI Details

Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation prior to the commissioning of the project, Project concerns investment in reverse flow capacity

PCI Benefits

General Criteria Fulfilled Specific Criteria Fulfilled

Yes

Competition, Market Integration, Security of Supply, Sustainability

Specific Criteria Fulfilled Comments

Time Schedule

Grant Obtention Date Delay Since Last TYNDP Delay Explanation

29/04/2015

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM