ENTSOG TYNDP 2017 - Annex A2 - Project Details

Current TYNDP : TYNDP 2017 - Annex A

Page 60 of 620

NDP and PCI Information

Schedule

Start Date

End Date

Third-Party Access Regime

Part of NDP NDP Number

Pre-Feasibility Feasibility FEED Market Test Permitting Supply Contracts FID Construction Commissioning

Considered TPA Regime Considered Tariff Regime Applied for Exemption

Yes (NDP 2016-2025)

Regulated Regulated

TRA-N-135

No

Currently PCI

Exemption Granted

No

Not Relevant

CBCA Decision Market Survey

Exemption in entry direction Exemption in exit direction

No

0.00% 0.00%

Not Relevant (no CBCA decision)

2022

2022

Pipelines and Compressor Stations Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

Technical specifications of the pipe are depending on the final route design (pipeline length at CZ side is approx. 75 km (at AT approx. 35 km); diameter is DN800-1200; compressor power ranges is 2-5 MW; initial capacity ranges is 55-111 GWh/d

=iERĝt &= &= $7 %RUGHU

800

75

2

Total

75

2

PCI Details

Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation prior to the commissioning of the project, Project concerns investment in reverse flow capacity

PCI Benefits

General Criteria Fulfilled Specific Criteria Fulfilled

Yes

Competition, Market Integration, Security of Supply, Sustainability

Specific Criteria Fulfilled Comments

Benefits

Main Driver Others Main Driver Explanation Market Integration

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM