ENTSOG TYNDP 2017 - Annex A2 - Project Details
Current TYNDP : TYNDP 2017 - Annex A
Page 60 of 620
NDP and PCI Information
Schedule
Start Date
End Date
Third-Party Access Regime
Part of NDP NDP Number
Pre-Feasibility Feasibility FEED Market Test Permitting Supply Contracts FID Construction Commissioning
Considered TPA Regime Considered Tariff Regime Applied for Exemption
Yes (NDP 2016-2025)
Regulated Regulated
TRA-N-135
No
Currently PCI
Exemption Granted
No
Not Relevant
CBCA Decision Market Survey
Exemption in entry direction Exemption in exit direction
No
0.00% 0.00%
Not Relevant (no CBCA decision)
2022
2022
Pipelines and Compressor Stations Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
Technical specifications of the pipe are depending on the final route design (pipeline length at CZ side is approx. 75 km (at AT approx. 35 km); diameter is DN800-1200; compressor power ranges is 2-5 MW; initial capacity ranges is 55-111 GWh/d
=iERĝt &= &= $7 %RUGHU
800
75
2
Total
75
2
PCI Details
Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation prior to the commissioning of the project, Project concerns investment in reverse flow capacity
PCI Benefits
General Criteria Fulfilled Specific Criteria Fulfilled
Yes
Competition, Market Integration, Security of Supply, Sustainability
Specific Criteria Fulfilled Comments
Benefits
Main Driver Others Main Driver Explanation Market Integration
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Made with FlippingBook