ENTSOG TYNDP 2017 - Annex A2 - Project Details
Current TYNDP : TYNDP 2017 - Annex A
Page 57 of 620
NDP and PCI Information
Schedule
Start Date
End Date
Third-Party Access Regime
Part of NDP NDP Number
Pre-Feasibility Feasibility FEED Market Test
Considered TPA Regime Considered Tariff Regime Applied for Exemption
Yes (NDP 2016-2025)
Regulated Regulated
TRA-N-133
03/2012
06/2018 06/2015
No
Currently PCI
Exemption Granted
Yes (6.4)
Not Relevant
Permitting Supply Contracts FID Construction Commissioning
CBCA Decision Market Survey
Exemption in entry direction Exemption in exit direction
No
0.00% 0.00%
Not Relevant (no CBCA decision)
2020
2020
Pipelines and Compressor Stations Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
The pipeline length at CZ side is approx. 12 km and at AT side is approx. 49 km; no compressor station is considered at CZ side.
%ĝHFODY &= 3RäWRUQi 5HLQWDO &= $7
800
12
Total
12
PCI Details
Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation prior to the commissioning of the project, Project concerns investment in reverse flow capacity
PCI Benefits
General Criteria Fulfilled Specific Criteria Fulfilled
Yes
Competition, Market Integration, Security of Supply, Sustainability
Specific Criteria Fulfilled Comments
Time Schedule
Grant Obtention Date Delay Since Last TYNDP Delay Explanation
01/10/2014
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM