ENTSOG TYNDP 2017 - Annex A2 - Project Details
Current TYNDP : TYNDP 2017 - Annex A
Page 50 of 620
Comment: Transmission between Bulgaria and Turkey via existing transmission system at IP Malkoclar, New capacity increment from 4Q 2025 to the level of 1140 GWh/d. Bulgartransgaz EAD 2025 BGg/BGT TRe
Strandzha (BG) / Malkoclar (TR)
570.0 GWh/d
Capacity Increments Variant(s) For Information Only Variant : Eastring - BG-3
Low capacity scenario (low in direction N->S), starting at Negru-Voda IP at RO-BG border, passing through BG using upgraded existing pipelines to Malkoclar IP at BG-TR border
Point
Operator
Year 2021
From Gas System To Gas System Capacity
200.0 GWh/d
Bulgartransgaz EAD
BGn
BG/EAR
Comment: Connection of Eastring at Negru-Voda IP, with domestic market, Entry/Exit capacity at domestic points may go up to the level of 200GWh/d if sum of all Exit capacities from domestic system to adjacent networks (or vice versa) is able to reach this level. Bulgartransgaz EAD 2021 BG/EAR BGn Comment: Connection of Eastring at Negru-Voda IP, with domestic market, Entry/Exit capacity at domestic points may go up to the level of 200 GWh/d if sum of all Exit capacities from domestic system to adjacent networks (or vice versa) is able to reach this level. Comment: Transmission between Eastring - Bulgaria and Turkey via existing IP Malkoclar, New capacity increment from 4Q 2025 to the level of 1140 GWh/d. Bulgartransgaz EAD 2025 TRi BGg/BGT Comment: Transmission via existing IP Negru-Voda with increase of capacity at level of 342 GWh/d, New capacity increment from 4Q 2025 to the level of 712 GWh/d. Exit means direction RO->BG. Bulgartransgaz EAD 2021 RO/TBP BGg/BGT Comment: Transmission via existing IP Negru-Voda with increase of capacity at level of 570 GWh/d, New capacity increment from 4Q 2023 to the level of 1140 GWh/d. Bulgartransgaz EAD 2025 BGg/BGT RO/TBP Bulgartransgaz EAD 2021 TRi BGg/BGT Bulgartransgaz EAD 2021 BGg/BGT RO/TBP
Eastring BG Domestic Point
200.0 GWh/d
570.0 GWh/d
Malkoclar (TR) > Strandzha (BG)
570.0 GWh/d 342.0 GWh/d
570.0 GWh/d
Negru Voda II, III (RO) / Kardam (BG)
712.0 GWh/d
Comment: Exit means direction RO->BG.
570.0 GWh/d 342.0 GWh/d
Bulgartransgaz EAD Bulgartransgaz EAD
2025 2021
RO/TBP BGg/BGT
BGg/BGT
TRe
Strandzha (BG) / Malkoclar (TR)
Comment: Transmission between Eastring - Bulgaria and Turkey via existing IP Malkoclar, New capacity increment from 4Q 2023 to the level of 712 GWh/d. Exit means direction BG->TR.
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM