ENTSOG TYNDP 2015

The demand range (for final and power) in the TSOs’ scenario is consistent with the range defined by Eurogas Base case and Slow Development scenarios. The upper range, corresponding to gas predominance in Vision 3 (Green scenario), reaches similar demand levels to the IEA NPS. Eurogas Environmental Case and IEA CPS are above the range defined by ENTSOG’s scenarios, while the IEA450 S and Commis- sion’s scenarios are below for the second half of the horizon.

Image courtesy of Fluxys Belgium

Ten Year Network Development Plan 2015 |

73

Made with