ENTSOG TYNDP 2015
%
350
250
150
50
-50
-150
GR 29% 0%
HR 26% 36%
HU 8% 156%
IE 1% 67%
IT -3% 9%
LT -10% 178%
LU 5% 136%
LV 20% 123%
MK 8% -22%
MT 0% ∞
NL -27% 85%
PL 16% 520%
PT 24% 99%
RO 29% 133%
RS 99% 180%
SE 26% -100%
SI 15% 3%
SK 8% 71%
UK -25% -13%
Final (res., com., ind.)
Power generation
%
350
250
150
50
-50
-150
GR 29% 156%
HR 26% -57%
HU 8% -12%
IE 1% 51%
IT -1% 28%
LT -10% 18%
LU 5% 31%
LV -10% 118%
MK 8% -22%
MT 0% ∞
NL -17% 154%
PL 16% 79%
PT 15% 426%
RO 29% 307%
RS 99% 180%
SE 13% -100%
SI 15% ∞
SK 8% 542%
UK -10% 70%
Final (res., com., ind.)
Power generation
4.3.2.4 Winter and summer averages
The modelling assessment differentiates between average summer and average winter conditions. The demand data for these climatic cases has been derived from the annual demand information provided by TSO assuming: \\ No differentiation between the daily average gas demand for power generation in summer and winter. \\ A “winter average factor” specific to each country is calculated as the devia- tion of the winter average demand from the yearly average demand.
Ten Year Network Development Plan 2015 |
55
Made with FlippingBook