ENTSOG TYNDP 2015

For each project, the commissioning year is related to the first capacity increment of the project in the case where there is more than one increment. For projects where the commissioning date is not available (N/A) in the Annex A, it means that the promoter has not submitted a capacity increment or did not specify a year within the time horizon. The first full year of operation used in the assessment is the first full calendar year following the commissioning date. The following figures provide a statistical overview of the projects (see Annex A for project details) based on information such as the type of infrastructure or the FID/PCI status.

13

37

26

PCI – LNG Non-PCI – LNG PCI – Transmission Non-PCI – Transmission PCI – UGS Non-PCI – UGS

7

Projects

88

88

Figure 2.1: Breakdown of the projects in TYNDP 2015 per PCI status (as approved in 2013) and per type of infrastructure

2013

2015

7

10

32

35

LNG Terminal – FID LNG Terminal – Non-FID UGS – FID UGS – Non-FID Transmission – FID Transmission – Non-FID

1 5 %

1 6 %

15

14

1 5 %

1 7 %

Projects

Projects

27

145

29

151

6 8 %

6 9 %

25

49

Figure 2.2: Comparison of project submission in TYNDP 2015 and TYNDP 2013 per type of infrastructure and FID status. The outer circle represents absolute numbers; the inner circle represents the share of each project type.

BREAKDOWN OF PROJECTS IN TYNDP 2015 BY FID STATUS AND PCI STATUS

PCI

Non-PCI

TOTAL

FID

13

34

47

NON-FID

95

117

212

TOTAL

259

108

151

Table 2.1: Breakdown of projects in TYNDP 2015 by FID status and PCI status

The number of projects submitted for inclusion in the TYNDP remains high showing the need to expand market integration benefits to the whole of Europe.

24 |