ENTSOG TYNDP 2015
For each project, the commissioning year is related to the first capacity increment of the project in the case where there is more than one increment. For projects where the commissioning date is not available (N/A) in the Annex A, it means that the promoter has not submitted a capacity increment or did not specify a year within the time horizon. The first full year of operation used in the assessment is the first full calendar year following the commissioning date. The following figures provide a statistical overview of the projects (see Annex A for project details) based on information such as the type of infrastructure or the FID/PCI status.
13
37
26
PCI – LNG Non-PCI – LNG PCI – Transmission Non-PCI – Transmission PCI – UGS Non-PCI – UGS
7
Projects
88
88
Figure 2.1: Breakdown of the projects in TYNDP 2015 per PCI status (as approved in 2013) and per type of infrastructure
2013
2015
7
10
32
35
LNG Terminal – FID LNG Terminal – Non-FID UGS – FID UGS – Non-FID Transmission – FID Transmission – Non-FID
1 5 %
1 6 %
15
14
1 5 %
1 7 %
Projects
Projects
27
145
29
151
6 8 %
6 9 %
25
49
Figure 2.2: Comparison of project submission in TYNDP 2015 and TYNDP 2013 per type of infrastructure and FID status. The outer circle represents absolute numbers; the inner circle represents the share of each project type.
BREAKDOWN OF PROJECTS IN TYNDP 2015 BY FID STATUS AND PCI STATUS
PCI
Non-PCI
TOTAL
FID
13
34
47
NON-FID
95
117
212
TOTAL
259
108
151
Table 2.1: Breakdown of projects in TYNDP 2015 by FID status and PCI status
The number of projects submitted for inclusion in the TYNDP remains high showing the need to expand market integration benefits to the whole of Europe.
24 |
ENTSOG – GRIP Central Eastern Europe 2014–2023