ENTSOG TYNDP 2015

Atlantic basin

The expansion of liquefaction capacity under construction in the Atlantic basin is located in Algeria, with an increase of 5 MTPA (6bcma) in Arzew- GL3Z (Gassi Touil) 1) and in the United States, where the commissioning of the four trains of Sabine Pass with 5 MTPA each (6bcma), will gradually come on stream between 2015 and 2017.

bcma

MTPA

120

160

110

140

100

90

120

80

100

70

60

80

50

50

40

30

40

20

20

10

0

0

Canada

USA

Angola

T&T

Norway

Libya Equatorial Guinea

Egypt

Algeria

Capacity under construction

Existing capacity

Planned

Figure 5.68: Potential evolution of the liquefaction capacity in the Atlantic basin. Breakdown by country (Source LNG journal)

The projects with planned commissioning dates before 2020, which are not under construction yet, are located in Canada (Goldboro LNG with 10MTPA/14 bcma) and the United States (10 different projects with at total liquefaction capacity of 107MTPA/147 bcma). The particular case of the LNG projects in the US is explained below. In addition, there are three projects in Nigeria with a total increase of the liquefaction capacity of 38.4 MTPA (53 bcma) and one project in Canada which is still under study.

Pacific basin

In the Pacific basin, most of the liquefaction projects under construction are locat- ed in Australia, which is expected to triplicate its current liquefaction capacity up to 73MTPA (100bcma) by 2017. Other projects are under construction in Indonesia (3MTPA/4bcma), Malaysia (2MTPA/3bcma) and Colombia (1MTPA/1.4bcma).

1) That is expected to come into operation in autumn 2014 during the edition of this report.

Ten Year Network Development Plan 2015 |

121

Made with