ENTSOG TYNDP 2015 - Annex C1 - Country Details

FR (FRANCE)

Final gas demand Multiple gas demand forecasts for France in the GRTgaz zones were provided for the power generation sector. Only a single non-power generation forecast has been provided, which was based on the assumptions close to the ones defining the Scenario A. GRTgaz has agreed on the following estimates for Scenario B, which correspond to the EU average difference between GREEN and GREY scenario for those TSOs where the GREEN estimates are above the GREY estimates: \\ Annual figures: Scenario B estimated as 11% lower than Scenario A \\ Design Case and 14-day Uniform Risk: Scenario B estimated as 8% lower than Scenario A. For TIGF zone, both scenarios A and B were provided by TIGF. Power generation  – general methodology For Vision 3, the annual load-factor for nuclear power generation has been reduced to 69% for the year 2020, while it is 73% for all other years and scenarios. This change was made to make the application of the methodology feasible, given the installed capacities of the different technologies, the net electricity demand and the general assumptions for the load-factors

Power generation  – Scenario by TSO

2015

2020

2025

2030

2035

ANNUALLY DEMAND GWh/y

14,433 44,824

52,734

52,734

52,734

GR (GREECE)

Final gas demand Only a single non-power generation forecast has been provided, which was based on the assumptions close to the ones defining the Scenario B. DESFA has agreed on the following estimates for Scenario A: \\ Annual figures: Scenario A estimated as 11% lower than Scenario B \\ Design Case: Scenario A estimated as 4% lower than Scenario B. \\ 14-day Uniform Risk: Scenario A estimated as 3% lower than Scenario B. Power generation  – general methodology The TSO submitted the inputs for the general methodology. No further comments have been reported.

Power generation  – Scenario by TSO

2015

2020

2025

2030

2035

GWh/d

DAILY PEAK

124

158

159

159

159

ANNUALLY DEMAND GWh/y

22,664 32,481

31,865

31,865

31,865

Ten Year Network Development Plan 2015 Annex C 1 | 7

Made with