CH (SWITZERLAND)
Final gas demand Multiple gas demand forecasts for Switzerland were provided for the power genera- tion sector. The demand figures provided for Scenarios A and B are identical. Power generation – general methodology The general methodology does not fit well with the Swiss gas sector. The important role of electricity exchanges in Switzerland along with the lack of coal-fired power generation has led to a pragmatic approach in the estimation of the Swiss gas demand for power generation based on the installed capacities taken from ENTSO-E’s visions: Vision 1 under the GREY global scenario
Annual load-factor of gas-fired power generation facilities: 30% Peak load-factor of gas-fired power generation facilities: 100% Vision 3 under the GREEN global scenario
Annual load-factor of gas-fired power generation facilities: 60% Peak load-factor of gas-fired power generation facilities: 100% The thermal gaps for these load-factors have been calculated and used in the modelling process.
CY (CYPRUS)
Final gas demand The demand figures provided for Scenarios A and B are identical. The development of gas demand is conditional on the development of gas supplies in Cyprus. In addition, it should be noted that no peak gas demand data has been provided beyond the daily average values, as no gas demand for heating is expected. Power generation – general methodology The assessment of power generation in Cyprus was not carried out following the general methodology.
CZ (CZECH REPUBLIC)
Final gas demand The demand figures provided for Scenarios A and B are identical and are based on the assumptions of Scenario A. Power generation – general methodology The TSO submitted the inputs for the general methodology. No further comments have been reported.
Power generation – Scenario by TSO
2015
2020
2025
2030
2035
GWh/d
DAILY PEAK
45.5
100
100
100
100
ANNUALLY DEMAND GWh/y
8,888 13,333
13,333
13,333
13,333
4 |
Ten Year Network Development Plan 2015 Annex C 1