ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Main Report
Mosonmagyaróvár (Gas Connect Austria > FGSZ) Unidirectional
GWh/d
GWh/d
IP Mosonmagyaróvár (AT > HU)
IP Mosonmagyaróvár (AT > HU)
250
250
200
200
150
150
100
100
50
50
0
0
Oct 2011
Dec 2011
Feb 2012
Apr 2012
Jun 2012
Aug 2012
Oct 2012
Dec 2012
Feb 2013
Apr 2013
Jun 2013
Aug 2013
Oct 2011
Dec 2011
Feb 2012
Apr 2012
Jun 2012
Aug 2012
Oct 2012
Dec 2012
Feb 2013
Apr 2013
Jun 2013
Aug 2013
Average daily Technical Capacity Booked non interruptible + interruptible Capacity
Flow Range
Booked non interruptible + interruptible Capacity Booked non interruptible Capacity
Flow
Technical Capacity
Figure 4.9.1: Mosonmagyaróvár: Flows and booked capacity vs. technical capacity (monthly)
Figure 4.9.2: Mosonmagyaróvár: Flows and booked capacity vs. technical capacity (daily)
The two upward and downward spikes on the daily graph correspond to the days of switching between winter and summer time.
Kulata / Sidirokastro (Bulgartransgaz > DESFA) Bidirectional
GWh/d
GWh/d
IP Kulata/Sidirokastro (BG > GR)
IP Kulata/Sidirokastro (BG > GR)
140
140
120
120
100
100
80
80
60
60
40
40
20
20
0
0
Oct 2011
Dec 2011
Feb 2012
Apr 2012
Jun 2012
Aug 2012
Oct 2012
Dec 2012
Feb 2013
Apr 2013
Jun 2013
Aug 2013
Oct 2011
Dec 2011
Feb 2012
Apr 2012
Jun 2012
Aug 2012
Oct 2012
Dec 2012
Feb 2013
Apr 2013
Jun 2013
Aug 2013
Average daily Technical Capacity Booked non interruptible + interruptible Capacity
Flow Range
Booked non interruptible + interruptible Capacity Booked non interruptible Capacity
Flow
Technical Capacity
Figure 4.10.1: Kulata / Sidirokastro: Flows and booked capacity vs. technical capacity (monthly)
Figure 4.10.2: Kulata / Sidirokastro: Flows and booked capacity vs. technical capacity (daily)
60 |
Southern Corridor GRIP 2014–2023
Made with FlippingBook