ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Annex B: Infrastructure Projects
PROJECTED CAPACITY INCREASES Interconnection
Capacity (GWh/d)
Hub Italia From Zone Hub Croatia
To Zone
Modelled Direction No entry No exit
Casalborsetti
506.00 506.00
Hub Croatia
Hub Italia
DESCRIPTION OF THE PROJECT
Covering the therritory from the gas node Omišalj on the island of Krk (Croatian Gas Transmission System) via Adriatic Sea to Casal Borsetti (Italian Gas Transmission System). The project is at its prefeasibility phase and is not expected to be completed within the time covered by the present GRIP.
EXPECTED BENEFITS
Security of Supply, Market integration, Reverse Flows, Diversification of sources, Diversification of routes, N-1 National (For Croatia), N-1 Regional, Back-up for renewables, It will be new cross border transmission between Croatia and Italy; fits in the idea of Adriatic Gas Ring.
COMMENTS ABOUT THE PROJECT FINANCING Public financing
Private financing
Multilateral financing
Southern Corridor GRIP 2014–2023 Annex B |
79