ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Annex B: Infrastructure Projects

Print

LNG main gas transit pipeline (Part of North-South Gas Corridor) Zlobin-Bosiljevo-Sisak-Kozarac- Slobodnica

TRA-N-075

Non-FID

Pipeline including CS

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter

Private Financing Public Financing Multilateral Financing

Plinacro Ltd Plinacro Ltd

Not part of TEN-E Yes None

TEN-E Project ?

Operator

In PCI list ?

IGAs

Web Link

www.plinacro.hr

THIRD-PARTY ACCESS REGIME

SCHEDULE

TECHNICAL INFORMATION

FID End of permitting phase

Total Compressor Power (MW) Expected Load Factor Diameter (range) (mm) # of Pipelines, nodes, CS Total Pipeline Length (km)

Considered TPA Regime Considered Tariff Regime

5 +308

Regulated Regulated

Applied for Exemption ? Exemption granted ? % Exemption in entry direction

Construction Commissioning

No No

2017 2019 Planned

+0.90

Last completed Phase :

DN 800 - 1000

% Exemption in exit direction

Diameter (range) (inches)

32" - 40"

Southern Corridor GRIP 2014–2023 Annex B |

76

ENTSOG TYNDP 2013-2013 - Annex A

Made with