ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Annex B: Infrastructure Projects

Print

Poseidon Pipeline

TRA-N-010

Non-FID

Pipeline including CS

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter Operator

Private Financing Public Financing Multilateral Financing

Project of European Interest Yes

IGI Poseidon S.A. IGI Poseidon S.A.

TEN-E Project ?

In PCI list?

6

IGAs

IGI Poseidon S.A. is a Joint Venture of 50% DEPA S.A. and 50% Edison International Holding NV, a 100% subsidiary of Edison SpA

Web Link

www.igi‐poseidon.com

TEN-E Requests

Date of Request

Year Funding Granted

23.04.2003 15.06.2005

2003 2006

06.07.2009

2010

THIRD-PARTY ACCESS REGIME

SCHEDULE

TECHNICAL INFORMATION

# of Pipelines, nodes, CS Total Pipeline Length (km) Total Compressor Power (MW) Expected Load Factor

FID Construction Commissioning End of permitting phase

Applied for Exemption ? Exemption granted ? Considered TPA Regime Considered Tariff Regime

2014 Q4

1

Negotiated (e.g. Exemption)

+210

2014 Q4

Negotiated (e.g. Exemption)

Yes Yes

2015 Q3 2019 Q2

+100 +1.00 DN 800

Last completed Phase :

% Exemption in entry direction % Exemption in exit direction

Diameter (range) (mm) Diameter (range) (inches)

– 89%

FEED

32"

Southern Corridor GRIP 2014–2023 Annex B |

48

ENTSOG TYNDP 2013-2013 - Annex A

Made with