ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Annex B: Infrastructure Projects
TRA-F-148
Slovak-Hungarian interconnector (Vecsés-Szada-Balassagyarmat)
FID
Pipeline including CS
SPONSORS
GENERAL INFORMATION
FINANCING
Promoter
Public Financing
Magyar Gaz Tranzit Zrt.
Not part of TEN-E
TEN-E Project ?
–
Operator
Private Financing
MGT Hungarian Gas Transit Ltd.
Yes
In PCI list ?
–
Multilateral Financing
1
IGAs
–
Web Link
THIRD-PARTY ACCESS REGIME
SCHEDULE
TECHNICAL INFORMATION
Considered TPA Regime
End of permitting phase
# of Pipelines, nodes, CS
regulated
2014
2
Considered Tariff Regime
FID
Total Pipeline Length (km)
regulated
+110
Applied for Exemption ?
Construction
Total Compressor Power (MW)
No
2013
Exemption granted ?
Commissioning
Expected Load Factor
no
2015 Q1
% Exemption in entry direction
Last completed Phase :
Diameter (range) (mm)
–
FID
DN 800
% Exemption in exit direction
Diameter (range) (inches)
–
32"