ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Annex B: Infrastructure Projects

Print

TRA-F-029

RO-BG Interconnection

FID

Pipeline including CS

Same project as TRA-F-059

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter

Public Financing

Transgaz

Not part of TEN-E

TEN-E Project ?

37%

Operator

Private Financing

Transgaz

No

In PCI list ?

63%

Multilateral Financing

None

IGAs

Web Link

www.transgaz.ro

THIRD-PARTY ACCESS REGIME

SCHEDULE

TECHNICAL INFORMATION

Considered TPA Regime

End of permitting phase

# of Pipelines, nodes, CS

Regulated

2011 Q4

1

Considered Tariff Regime

FID

Total Pipeline Length (km)

Regulated

2010 Q4

+25.00

Applied for Exemption ?

Construction

Total Compressor Power (MW)

No

2013 Q2

Exemption granted ?

Commissioning

Expected Load Factor

Not relevant

2014 Q2

+1.00

% Exemption in entry direction

Last completed Phase :

Diameter (range) (mm)

FID

DN 500

% Exemption in exit direction

Diameter (range) (inches)

20"

Southern Corridor GRIP 2014–2023 Annex B |

27