ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Annex B: Infrastructure Projects
TRA-F-029
RO-BG Interconnection
FID
Pipeline including CS
Same project as TRA-F-059
SPONSORS
GENERAL INFORMATION
FINANCING
Promoter
Public Financing
Transgaz
Not part of TEN-E
TEN-E Project ?
37%
Operator
Private Financing
Transgaz
No
In PCI list ?
63%
Multilateral Financing
None
IGAs
–
Web Link
www.transgaz.ro
THIRD-PARTY ACCESS REGIME
SCHEDULE
TECHNICAL INFORMATION
Considered TPA Regime
End of permitting phase
# of Pipelines, nodes, CS
Regulated
2011 Q4
1
Considered Tariff Regime
FID
Total Pipeline Length (km)
Regulated
2010 Q4
+25.00
Applied for Exemption ?
Construction
Total Compressor Power (MW)
No
2013 Q2
Exemption granted ?
Commissioning
Expected Load Factor
Not relevant
2014 Q2
+1.00
% Exemption in entry direction
Last completed Phase :
Diameter (range) (mm)
–
FID
DN 500
% Exemption in exit direction
Diameter (range) (inches)
–
20"
Southern Corridor GRIP 2014–2023 Annex B |
27
ENTSOG TYNDP 2013-2013 - Annex A
Made with FlippingBook