ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Annex B: Infrastructure Projects

Print

Plinovodi projects cluster 6

Code

Name

Commissioning

Technical information

FID status

TEN-E

PCI project

M9a Lendava - Kidričevo M10 Vodice - Rateče M9b Kidričevo - Vodice

Pipeline 72 km and Compressor station 80 MW non-FID

2016 2017 2018

TEN-E 2011

No No No

TRA-N-098 TRA-N-100 TRA-N-263

Pipeline 79 km

non-FID

TEN-E 2010, 2011

Pipeline 115 km and Compressor station 60 MW non-FID

TEN-E 2012

GENERAL INFORMATION

Promoter Operator

Plinovodi Plinovodi

THIRD-PARTY ACCESS REGIME

Considered TPA Regime

Negotiated

Considered Tariff Regime

Negotiated

Applied for Exemption ?

Not yet

Web Link

www.plinovodi.si/wp-content/uploads/2011/09/RN-2014-2023.pdf

DESCRIPTION AND BENEFITS OF THE PROJECT

These projects aim at providing additional supply to the Slovenian gas market, but mainly represent a substantial transit capacity to the Slovenian transmission system from Hungary to Italy, establishing two new Interconnection Points: - one at the Slovenian-Hungarian border (Lendava) with an entry capacity of 288 GWh/d, possibly increasing to 819 GWh/d and - one at the Slovenian-Italian border (Tarvisio) with an exit capacity of 819 Gwh/d. The implementation of the project depends on the existence of corresponding upstream (within Hungary) transmission capacity.