Plinovodi projects cluster 2

Code

Name

Commissioning

Technical information Border metering station Compressor station 5 MW

FID status

TEN-E

PCI project

MRS Šempeter - reconstruction

FID

2014 2016 2023

Not part of TEN-E Not part of TEN-E TEN-E 2010, 2013

No No No

TRA-F-110 TRA-N-092 TRA-N-108

CS Ajdovščina (3rd unit)

non-FID non-FID

M3 reconstruction (Ajdovščina - Šempeter / Gorizia)

Pipeline 31 km

GENERAL INFORMATION

Operator Promoter

THIRD-PARTY ACCESS REGIME

Plinovodi Plinovodi

Considered TPA Regime

Regulated Regulated

Considered Tariff Regime

Applied for Exemption ?

No

Web Link

www.plinovodi.si/wp-content/uploads/2011/09/RN-2014-2023.pdf

DESCRIPTION AND BENEFITS OF THE PROJECT These projects aim at increasing the cross-border capacity of the connection with Italy and adjusting the operating parametres to the ones of the Italian transmission system. - The first phase comprises the FID project of the reconstruction of the Border metering station (for reverse flow), to be commissioned in 2014. - The second phase comprises a non-FID project, the extension of the C/S at Ajdovščina for the increase of capacity of the existing pipeline to Italy, planned to be commissioned in 2016. - The third phase comprises the non-FID project of the pipeline increasing the capacity of the existing M3 pipeline to Italy on the section from Ajdovščina to šempeter looping between Ajdovščina and Šempeter, planned to be commissioned in 2023.

Southern Corridor GRIP 2014–2023 Annex B |