ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Annex B: Infrastructure Projects
Plinovodi projects cluster 2
Code
Name
Commissioning
Technical information Border metering station Compressor station 5 MW
FID status
TEN-E
PCI project
MRS Šempeter - reconstruction
FID
2014 2016 2023
Not part of TEN-E Not part of TEN-E TEN-E 2010, 2013
No No No
TRA-F-110 TRA-N-092 TRA-N-108
CS Ajdovščina (3rd unit)
non-FID non-FID
M3 reconstruction (Ajdovščina - Šempeter / Gorizia)
Pipeline 31 km
GENERAL INFORMATION
Operator Promoter
THIRD-PARTY ACCESS REGIME
Plinovodi Plinovodi
Considered TPA Regime
Regulated Regulated
Considered Tariff Regime
Applied for Exemption ?
No
Web Link
www.plinovodi.si/wp-content/uploads/2011/09/RN-2014-2023.pdf
DESCRIPTION AND BENEFITS OF THE PROJECT These projects aim at increasing the cross-border capacity of the connection with Italy and adjusting the operating parametres to the ones of the Italian transmission system. - The first phase comprises the FID project of the reconstruction of the Border metering station (for reverse flow), to be commissioned in 2014. - The second phase comprises a non-FID project, the extension of the C/S at Ajdovščina for the increase of capacity of the existing pipeline to Italy, planned to be commissioned in 2016. - The third phase comprises the non-FID project of the pipeline increasing the capacity of the existing M3 pipeline to Italy on the section from Ajdovščina to šempeter looping between Ajdovščina and Šempeter, planned to be commissioned in 2023.
Southern Corridor GRIP 2014–2023 Annex B |
121
ENTSOG TYNDP 2013-2013 - Annex A
Made with FlippingBook