2.3.3 LNG REGASIFICATION PLANTS

For LNG related projects, the 6 planned projects are equally distributed between Belgium, France and Italy. The detailed list is reported in Table 2.3.

REGASIFICATION PROJECTS

Project Promoter

Name

TYNDP Code

FID Status

Commissioning

Zeebrugge LNG Terminal – 5 th Tank & 2 nd Jetty

LNG-F-229

FID

2019

Fluxys LNG

Zeebrugge LNG Terminal – 3 rd Jetty

LNG-N-742

Non-FID (L. Adv.)

2022

Nuove Energie S.r.l.

Porto Empedocle LNG

LNG-N-198

Non-FID (Adv.)

2021

Gas Natural Rigassificazione Italia

Onshore LNG terminal in the Northern Adriatic

LNG-N-217

Non-FID (L. Adv.)

2021

Elengy

Montoir LNG Terminal Expansion

LNG-N-225

Non-FID (L. Adv.)

2020

Fosmax LNG

Fos Cavaou LNG Terminal Expansion

LNG-N-227

Non-FID (L. Adv.)

2020

Table 2.3: List of LNG projects [Adv.: advanced; L. Adv.: less-advanced] (Source: ENTSOG data collection for TYNDP 2017 based on information submitted by TSOs and other project promoters)

Figure 2.6 illustrates the distribution of the new potential regasification capacity among the countries of the Region, with the biggest number for Italy (52%), followed by France (35%) and Belgium (12%). A similar trend can be seen analysing the projects in terms of storage capacity, with very similar percentages for the three countries (50% for Italy, 34% for France and 15% for Belgium).

Project Yearly Volume (bcm/y)

Project Storage Capacity (m³ of LNG)

10 12 14 16 18

700,000

8.0

600,000

280,000

500,000

10.8

400,000

410,000

0 2 4 6 8

300,000

320,000

180,000

200,000

8.0

3.8

100,000

0

BE

FR

IT

DE

LU

CH

Storage capacity – FID Storage volume – FID

Storage capacity – Advanced Non-FID Storage volume – Advanced Non-FID

Storage capacity – Less-Advanced Non-FID Storage volume – Less-Advanced Non-FID

Figure 2.6: Regasification capacity and storage capacity of LNG projects in the South-North Corridor Region

(Source: ENTSOG data collection for TYNDP 2017 based on information submitted by TSOs and other project promoters)

South-North Corridor GRIP 2017 |

25