ENTSOG South-North Corridor GRIP 2017 - Main Report

2.3.1 TRANSMISSION NETWORKS

The greatest part of the projects planned in the next two decades in the South-North Corridor are related to the development of the transmission networks (new pipelines, compressor stations, adaptation of existing infrastructure, etc.). A detailed list of the projects belonging to this asset category is compiled in Table 2.1. This table is filled using information collected by ENTSOG by May 2016 for TYNDP 2017 purposes.

TRANSMISSION PROJECTS

Project Promoter

Name

TYNDP Code

FID Status

Commissioning

MONACO section phase I (Burghausen-Finsing)

TRA-F-241

FID

2017

bayernets GmbH

VDS Wertingen

TRA-N-340

Non-FID (L. Adv.)

2019

Reverse Flow Transitgas Switzerland

TRA-F-230

FID

2018

FluxSwiss

L/H Conversion

TRA-N-500

Non-FID (Adv.)

2020

Fluxys Belgium

Fluxys TENP GmbH & Open Grid Europe GmbH

Reverse Flow TENP Germany

TRA-F-208

FID

2018

GALSI Pipeline Project

TRA-N-012

Non-FID (Adv.)

2019

Galsi S.p.A.

NOWAL – Nord West Anbindungsleitung

TRA-F-291

FID

2017

GASCADE Gastransport GmbH

EUGAL – Europaeische Gasanbindungsleitung (European Gaslink)

TRA-N-763

Non-FID (Adv.)

2019

Oude(NL)-Bunde(DE) GTG H-Gas

TRA-N-949

Non-FID (L. Adv.)

2020

Gastransport Nord GmbH

Embedding CS Folmhusen in H-Gas

TRA-N-951

Non-FID (L. Adv.)

2020

Transport of gas volumes to the Netherlands

TRA-N-808

Non-FID (Adv.)

2021

Gasunie Deutschland Transport Services GmbH

Additional East-West transport NL

TRA-N-809

Non-FID (L. Adv.)

2023

GUD: Complete conversion to H-gas

TRA-N-955

Non-FID (L. Adv.)

2030

Gasunie Deutschland, NEL Gastransport, Fluxys Deutschland

Expansion NEL

TRA-N-807

Non-FID (Adv.)

2020

Val de Saône project

TRA-F-43

FID

2018

Reverse capacity from CH to FR at Oltingue

TRA-F-45

FID

2018

Gascogne-Midi: adaptation of stations in Cruzy and St Martin Reverse capacity from France to Germany at Obergailbach

TRA-F-391

FID

2018

GRTgaz

TRA-N-047

Non-FID (L. Adv.)

2022

Developments for Montoir LNG terminal 2.5 bcm expansion

TRA-N-258

Non-FID (L. Adv.)

2022

Developments for Fosmax (Cavaou) LNG 8.25 bcm expansion

TRA-N-269

Non-FID (L. Adv.)

2022

Iberian-French corridor: Eastern Axis-Midcat Project

TRA-N-256

Non-FID (L. Adv.)

2024

GRTgaz and TIGF

22 |

South-North Corridor GRIP 2017