ENTSOG South-North Corridor GRIP 2017 - Main Report
According to this classification, the pie chart in Figure 2.3 illustrates the number of projects in the South-North Corridor Region, combined with the category of asset (transmission networks, storage sites, LNG regasification plants) and the develop- ment status.
TRA – FID TRA – Advanced Non-FID TRA – Less-Advanced Non-FID UGS – FID UGS – Advanced Non-FID UGS – Less-Advanced Non-FID LNG – FID LNG – Advanced Non-FID LNG – Less-Advanced Non-FID
4
2
17
2
1 1
Number of Projects
17
10
Figure 2.3: Number of infrastructure projects per class (LNG, storages, pipelines) and status (FID, advanced non-FID and less-advanced non-FID) in the South-North Corridor Region (Source: ENTSOG data collection for TYNDP 2017 based on information submitted by TSOs and other project promoters)
Transmission networks projects cover 81,5% of the total amount (44 projects), while storage and LNG regasification show lower percentages, 7.5% (4 projects) and 11% (6 projects) respectively. In general, the projects are equally distributed among the different statuses, although “FID” projects cover a higher percentage in transmission network and storage pro- jects, while the most frequent status for LNG projects is “Less advanced non-FID”.
20 |
South-North Corridor GRIP 2017
Made with FlippingBook