ENTSOG Implementation and Monitoring Report 2017 - Balancing Network Code

Overview of IPs with coexistence of hourly and daily regimes and other points where (re-) nomination rules apply

INDICATION OF IPs WHERE HOURLY AND DAILY NOMINA- TION REGIMES CO-EXIST AT THE TWO SIDES OF ONE (OR MORE) IP(S) OF YOUR BALANCING ZONE (ART. 16)?

DID THE NRA DETERMINE THAT THE NOMINATION AND RE-NOMINATION PROCEDURE IS REQUIRED AT POINTS OTHER THAN IPs ACCORDING TO ART. 18 AND DO THE PRINCIPLES APPLY ACCORDING TO ART. 18.2? (PLEASE INDICATE THESE OTHER POINTS E. G. STORAGE POINTS, LNG POINTS, END CONSUMER POINTS.) Non-EU entry/exit points (Gela, Mazara del Vallo, Passo Gries, Bizzarone, San Marino), LNG entry points, storage entry/exit points, indigenous production (natural gas and biomethane) entry points, delivery to other transmission networks, redelivery points (distribution, final customers).

COUNTRY

IT

Tarvisio/Arnoldstein IP between Italy and Austria

LT

LNG point, domestic exit point.

LV

No exceptions for IPs

NL

BBL  2) : Bacton (BBL)/Bacton (IUK) GTS – No

GTS – All network points except the ones to DSO-networks.

PL

PL H-gas: Cieszyn (PL)/Cesky Tesin (CZ)

H-gas: The nominations are required regarding storage points, LNG point, end consumers points, production facilities.a H-gas: The nominations are required regarding storage points, LNG point, end consumers points, production facilities. L-gas: The nominations are required regarding end consumers points. TGPS: n/a Nominations are required for all network connection points with storage facilities, LNG Terminal facilities and directly connected end consumers

PT

RO

The entry points in the NTS from the production fields, from the underground storages; Exit points from the NTS towards the end consumers, towards the distribution systems and towards the underground storages.

SE

SK

IP Baumgarten (SK/AT)

SI

IP Gorizia (IT)/ Šempeter (SI)  3)

Aggregated end consumer points

UK-GB

Bacton (IUK)/Bacton (BBL)

2) In the Netherlands the stakeholders have been consulted regarding harmonisation: https://www.bblcompany.com/about-bbl/consultations-implementation-information/$1125/$1126.

3) In Slovenia, TSO collects all nominations on hourly bases. In the matching process, TSO aggregates hourly nominations of network users to daily values in order to meet the agreed format for data exchange with adjacent TSO. Since TSO is capable to exchange data with adjacent TSO both on hourly or daily level, the interconnection point was declared as a point where hourly and daily regime for nominations co-exist.

38 |

ENTSOG BAL NC Implementation and Effect Monitoring Report 2017