Annex V: Overview of IPs with coexistence of hourly and daily regimes and other points where (re-) nomination rules apply

Overview of IPs with coexistence of hourly and daily regimes and other points where (re-) nomination rules apply

INDICATION OF IPS WHERE HOURLY AND DAILY NOMI- NATION REGIMES CO-EXIST AT THE TWO SIDES OF ONE (OR MORE) IP(S) OF YOUR BALANCING ZONE (ART. 16)?

DID THE NRA DETERMINE THAT THE NOMINATION AND RE-NOMINATION PROCEDURE IS REQUIRED AT POINTS OTHER THAN IPS ACCORDING TO ART. 18 AND DO THE PRINCIPLES APPLY ACCORDING TO ART. 18.2? (PLEASE INDICATE THESE OTHER POINTS E. G. STORAGE POINTS, LNG POINTS, END CONSUMER POINTS.)

COUNTRY

AT

IP Arnoldstein (AT)

BE/LU  1)

Alveringem (BE/FR), Blaregnies (BE)/Blaregnies Troll (FR) (Blaregnies Segeo)

BG

Domestic end-points

CZ

Waidhaus (CZ/DE), Brandov Opal (CZ/DE), Brandov Stegal Hora sv. Katerˇiny – Olbernhau (CZ/DE), Hora sv. Katerˇiny (CZ/DE), Cˇ eský Teˇšín (CZ/PL)

Virtual storage points, directly connected customers

DE

Obergailbach (FR)/Medelsheim (DE)

Storages

EE

EE_LV border

EL

The same rules apply in all entry and exit points of the Greek NGTS apart from the LNG entry point (Agia Triada).

ES

The provisions relating to nomination processes apply to: 1. All entry points to transmission network: LNG, storage, VIP for European interconnections and IP with third countries 2. The following exits of the transmission network: connection to LNG, storage, VIP for European interconnections and IP with third countries 3. Other exit points Enagás, in its role of Technical System Manager considers necessary

FR

GRTgaz – Taisnières FR/BE), Obergailbach (FR/DE), Jura (FR/CH), Oltingue (FR/CH) TIGF – No

HR

Rogatec (HR/SI), Dravaszerdahely (HR/HU)

All entry and exit points

HU

IE

Storage Points and Domestic Entry and Exit Points

1) In Belgium and Luxembourg, the stakeholders have been consulted regarding harmonisation: Stakeholders are aware of the situation and did not raise any problem. Contracts were not adapted.