From the Portuguese and Spanish side, demand scenarios were stablished as following:
DEMAND SCENARIO
DESCRIPTION
Moderate economic growth, scenarios were built from the forecasted values for summer, winter and peak demand for 2020, 2025 and 2030 Moderate economic growth and existing coal fired power plants of Sines and Pego are not decommissioned until 2025 High economic growth, scenarios were built from the forecasted values for summer, winter and peak demand for 2020, 2025 and 2030 High economic growth and existing coal fired power plants of Sines and Pego are decommissioned before 2025
Final Demand
Base scenario
Power Sector
Portugal
Final Demand
SoS scenario
Power Sector
Enagás stablished three scenarios in 2020, 2025 and 2030, average winter, average summer and peak winter day
Spain
Final demand & Power sector
Table 7.1: Description of demand scenarios in Portugal and Spain of 3 rd Interconnection Point between Portugal and Spain technical studies (Source: TSO own elaboration)
In this joint study, each TSO determined the potential capacity in the 3 rd IP PT-ES for all the scenarios and considered the values of highest probability of occurrence, obtaining the common capacities (lesser rule) shown in the following table:
3 RD IP CAPACITY
2020
2025
2030
PT
ES
Final Value (GWh/day)
1 st Step 1 st Step
70
107
2 nd Step
2 nd Step
Spain
to Portugal
3 rd Step
139
1 st Step 1 st Step
70
97
2 nd Step
2 nd Step
to Spain
Portugal
3 rd Step
126
Table 7.2: Final 3 rd IP capacity for both directions (Source: TSO own elaboration)
The total cost of the considered infrastructures is approximately M€ 771. The cost of the considered infrastructures for the 1 st Stage of the project is approx- imately M€ 189 and for the 2 nd Stage of the project is approximately M€ 582, with a total of M€ 771 7) . The outputs of both technical studies (capacities and related infrastructures) have been considered in ENTSOG TYNDP 2017 8) and have also been included in the infrastructure chapter of this GRIP South.
7) 3 rd Interconnection point between Spain and Portugal, technical study between Enagás and REN 8) http://www.entsog.eu/publications/tyndp#ENTSOG-TEN-YEAR-NETWORK-DEVELOPMENT-PLAN-2017