ENTSOG Gas Regional Investment Plan South 2017 - Main Report

MidCat (TRA-N-161 + TRA-N-727 + TRA-N-256)

In Spain, this project consists of the infrastructures already included in STEP (TRA- N-161), and further infrastructure in Enagás transmission network: a pipeline from Castelnou to Villar de Arnedo (214km), a pipeline from Tivissa to Arbós (114km), and increments of the power of the compressor stations of Zaragoza (+5MW) and Arbós (+5MW). The commissioning date of these additional infrastructures is 2022. In France, this project consists in the infrastructures already included in STEP (TIGF), plus Midi pipeline in TIGF and GRTgaz zones, and Eridan, Arc Lyonnais, Perche pipeline, CS Palleau, CS Saint-Avis and CS Saint-Martin-de-Crau in GRTgaz zone. This last set of infrastructures is considered as French network reinforcement, and therefore is required for removing market tools (see page on merger of zones in France) and increase capacity in the South (either from Spain or from LNG termi- nals in Fos – TRA-N-269). The commissioning date of these projects is between 2022 and 2024, considering that the artère du Midi project is less advanced. MidCat project creates bidirectional capacity: 230GWh/d from Spain to France and 160GWh/d from France to Spain.

MIDCAT PROJECT: INFRASTRUCTURES

TYNDP Code

Commis- sioning Year

Length (km)

Diameter (mm)

Compressor Power (MW)

Type

Name

Status

Section

CS Martorell

36

Pipeline including CS

Enagás Transporte, S.A.U.

Advanced Non-FID

Hostalrich – Figueras

TRA-N-161

2021

79

900

Pipeline Figueras – French border Pipeline Spanish border –Barbaira Loop Castelnou – Villar de Arnedo +

28

900

Pipeline including CS

Advanced Non-FID

TRA-N-252 TIGF

2022

120

900

Pipeline including CS

Enagás Transporte, S.A.U.

Less-Advanced Non-FID

TRA-N-727

2022

214

640

5

CS Zaragoza (increment)

Loop Tivissa – Arbós + CS Tivissa filters

Pipeline including CS

Enagás Transporte, S.A.U.

Less-Advanced Non-FID

TRA-N-727

2022

114

740

21

+ CS Arbós (increment)

Pipeline including CS Pipeline including CS Pipeline including CS Pipeline including CS Pipeline including CS Pipeline including CS Pipeline including CS Pipeline including CS Pipeline including CS Pipeline including CS

Less-Advanced Non-FID Less-Advanced Non-FID Less-Advanced Non-FID Less-Advanced Non-FID Less-Advanced Non-FID Less-Advanced Non-FID Less-Advanced Non-FID Less-Advanced Non-FID Less-Advanced Non-FID Less-Advanced Non-FID

Eridan (GRTgaz section) Palleau CS (GRTgaz section) St-Avit CS (GRTgaz section) Barbaira – Border (TIGF section) Perche (GRTgaz section) St-Martin de Crau CS Arc Lyonnais (GRTgaz section) Barbaira CS (TIGF section) Midi pipeline (GRTgaz section) Midi pipeline (TIGF section)

TRA-N-256 GRTgaz and TIGF

2024

220

1.200

TRA-N-256 GRTgaz and TIGF

2024

50

TRA-N-256 GRTgaz and TIGF

2024

15

TRA-N-256 GRTgaz and TIGF

2024

120

900

TRA-N-256 GRTgaz and TIGF

2024

63

900

TRA-N-256 GRTgaz and TIGF

2024

30

TRA-N-256 GRTgaz and TIGF

2024

150

1.200

TRA-N-256 GRTgaz and TIGF

2024

7

TRA-N-256 GRTgaz and TIGF

2024

200

1.050

TRA-N-256 GRTgaz and TIGF

2024

40

1.050

Table 6.9: MidCat project: infrastructures (Source: TYNDP 2017)