ENTSOG Gas Regional Investment Plan South 2017 - Main Report

6.2.2.1 UGS capacity

CAPACITY CREATED BY UGS PROJECTS IN THE SOUTH REGION UNTIL 2021

Existing Capacity as of 01/01/2016

UGS

Direction

2017

2018

2019

2020

2021

FR (PEG N) > UGS

354.00

354.00

354.00

354.00

354.00

354.00

Nord-Atlantique

UGS > FR (PEG N)

479.00

479.00

479.00

479.00

479.00

479.00

FR (PEG N) > UGS

102.30

102.30

102.30

102.30

102.30

102.30

Nord-B/ SEDIANE B

UGS > FR (PEG N)

275.00

275.00

275.00

275.00

275.00

275.00

FR (PEG N) > UGS

148.50

148.50

148.50

148.50

148.50

148.50

Nord-Est/ SERENE Nord

UGS > FR (PEG N)

192.50

192.50

192.50

192.50

192.50

192.50

FR (PEG N) > UGS

194.70

194.70

194.70

194.70

194.70

194.70

Nord-Ouest/ SEDIANE

UGS > FR (PEG N)

313.50

313.50

313.50

313.50

313.50

313.50

FR (TRS) > UGS

329.00

329.00

329.00

329.00

329.00

329.00

Sud-Atlantique

UGS > FR (TRS)

369.00

369.00

369.00

369.00

369.00

369.00

FR (TRS) > UGS

150.00

150.00

150.00

150.00

150.00

150.00

Sud-Est/ SALINE

UGS > FR (TRS)

835.00

835.00

835.00

835.00

835.00

835.00

FR (TRS) > UGS

261.80

261.80

261.80

261.80

261.80

261.80

UGS Lussagnet/Izaute (TIGF)

UGS > FR (TRS)

503.80

503.80

503.80

503.80

503.80

503.80

ES > UGS

133.00

150.00

228.00

233.00

259.00

262.00

Virtual Storage (ES)

UGS > ES

214.00

232.00

255.00

288.00

369.00

371.00

Table 6.4: Capacity created by UGS projects in the South Region until 2021 (no capacity change afterwards). (Source: TYNDP 2017)

A new UGS salt cavern at Carriço in Portugal, is planned to be build and to be commissioned in 2022 with a working volume of 58mcm. Carriço UGS is based on caverns leached in a salt dome. Surface plant includes the facilities for injection and withdrawal of natural gas from the caverns in operation. The capacity of the UGS in the Bages area in Spain was not considered in the TYNDP 2017.