5.4.2 CAPACITY SUBSCRIPTION AT IPS BETWEEN SPAIN AND FRANCE (VIP PIRINEOS) After January 2017 60GWh/d of capacity is offered to the market in the France–Spain direction, unbundled firm capacity in Spain, which can be matched with the already existing interruptible short-term capacity in France. This additional capacity has been booked, and used, in the first days of 2017 (from 08/01/2017 until 11/01/2017). (See Figure 5.14). Since December 2015, as a result of the Open Season held in July 2010, approxi- mately the 90% of the common firm capacity from France to Spain is booked.
GWh/d
VIP Pirineos (France – Spain direction)
250 225 200 175 150 125 100
75 50 25
0
Jan 14
Jul 14
Jan 15
Jul 15
Jan 16
Jul 16
Jan 17
Jul 17
Jan 18
Booked Firm Capacity FR-ES
Available Firm Capacity
Additional capacity FR-ES
Common Firm Capacity FR-ES
Physical flow (FR-ES)
After February 2017, only long-term capacity bookings are included. Actual booked capacity could be higher after adding short-term capacity.
Figure 5.14: Capacity subscription at IPs between Spain and France (VIP PIRINEOS), France – Spain direction (Source: TSO own elaboration)
Since December 2015, regarding the Spain – France direction, the capacity increased from 165GWh/d to 225GWh/d after the commissioning of the infrastruc- tures of Open Season 2010. According to the latest subscription information, approximately only half of the capacity is already booked.
GWh/d
VIP Pirineos (Spain – France direction)
250 225 200 175 150 125 100
75 50 25
0
Jan 14
Jul 14
Jan 15
Jul 15
Jan 16
Jul 16
Jan 17
Jul 17
Jan 18
Physical flow (ES-FR) Available Capacity
Booked Capacity ES-FR
Common Firm Capacity ES-FR
Figure 5.15: Capacity subscription (long term) at IPs between Spain and France (VIP PIRINEOS), Spain – France direction (Source: TSO own elaboration)
Gas Regional Investment Plan of the South Region 2017 | 61