ENTSOG Gas Regional Investment Plan (GRIP) 2017 - 2026 / Southern Corridor / Main Report

Revythoussa (DESFA > DESFA)

160 GWh/d

GWh/d

IP Revythoussa (LNG > GR)

IP Revythoussa (LNG > GR)

160

140 120 100

140 120 100

60 40 20 80

60 40 20 80

0

0

Apr 2014

Jun 2014

Aug 2014

Oct 2014

Dec 2014

Feb 2015

Apr 2015

Jun 2015

Aug 2015

Oct 2015

Dec 2015

Feb 2016

Apr 2014

Jun 2014

Aug 2014

Oct 2014

Dec 2014

Feb 2015

Apr 2015

Jun 2015

Aug 2015

Oct 2015

Dec 2015

Feb 2016

Booked non interruptible + interruptible Capacity Booked non interruptible Capacity

Technical Capacity

Flow

Average daily

Range

Booked non interruptible + interruptible Capacity

Technical Capacity

Figure 5.69: Revythoussa: Flows and booked capacity vs. technical capacity (monthly)

Figure 5.70: Revythoussa: Flows and booked capacity vs. technical capacity (daily)

80 |

Southern Corridor GRIP 2017–2026

Made with FlippingBook - Online magazine maker