ENTSOG Gas Regional Investment Plan (GRIP) 2017 - 2026 / Southern Corridor / Main Report
Cavarzere (Terminale GNL Adriatico > Snam Rete Gas and Infrastrutture Trasporto Gas)
GWh/d
350 GWh/d
IP Cavarzere (Adriatic LNG > Snam Rete Gas & ITG)
IP Cavarzere (Adriatic LNG > Snam Rete Gas & ITG)
350
300
300
250
250
200
200
150
150
100
100
50
50
0
0
Apr 2014
Jun 2014
Aug 2014
Oct 2014
Dec 2014
Feb 2015
Apr 2015
Jun 2015
Aug 2015
Oct 2015
Dec 2015
Feb 2016
Apr 2014
Jun 2014
Aug 2014
Oct 2014
Dec 2014
Feb 2015
Apr 2015
Jun 2015
Aug 2015
Oct 2015
Dec 2015
Feb 2016
Booked non interruptible + interruptible Capacity Booked non interruptible Capacity
Flow
Technical Capacity
Average daily
Range
Booked non interruptible + interruptible Capacity
Technical Capacity
Figure 5.65: Cavarzere: Flows and booked capacity vs. technical capacity (monthly)
Figure 5.66: Cavarzere: Flows and booked capacity vs. technical capacity (daily)
IP Livorno (OLT LNG > Snam Rete Gas)
180 GWh/d
GWh/d
IP Livorno (OLT LNG > Snam Rete Gas)
IP Livorno (OLT LNG > Snam Rete Gas)
180
160 140 120 40 60 20 80 100
160 140 120 40 60 20 80 100
0
0
Apr 2014
Jun 2014
Aug 2014
Oct 2014
Dec 2014
Feb 2015
Apr 2015
Jun 2015
Aug 2015
Oct 2015
Dec 2015
Feb 2016
Apr 2014
Jun 2014
Aug 2014
Oct 2014
Dec 2014
Feb 2015
Apr 2015
Jun 2015
Aug 2015
Oct 2015
Dec 2015
Feb 2016
Booked non interruptible + interruptible Capacity Booked non interruptible Capacity
Technical Capacity
Flow
Average daily
Range
Booked non interruptible + interruptible Capacity
Technical Capacity
Figure 5.67: Livorno: Flows and booked capacity vs. technical capacity (monthly)
Figure 5.68: Livorno: Flows and booked capacity vs. technical capacity (daily)
Booked capacity on TSOs network is not, in this case, a useful indicator for the capacity adequacy analysis, as in Italy the terminal operators reserve capacity in the transmission system on behalf of their users. The graphs above reflect the low utilisation rate of the Italian LNG regasification terminals (GNL Italia and OLT LNG) except for the one backed by long-term supply contracts (Terminale GNL Adriatico). The reported trend is related to the period 2014 – 2016. Improved utilisation rates are expected in the next years when additional LNG liquefaction capacity will come on stream.
Southern Corridor GRIP 2017–2026 |
79