ENTSOG Gas Regional Investment Plan (GRIP) 2017 - 2026 / Southern Corridor / Main Report
C. LNG ENTRY POINTS Differently from the dynamics experienced at pipelines interconnection points, at LNG Entry Points gas flows are intrinsically more fluctuating, especially if the punctual, daily values are considered. More stable indications can be drawn from the analysis of monthly dynamics. Although the LNG imports are generally more volatile than the pipeline ones, and therefore the terminals may know periods of low utilisation, depending on the market conditions, the role of LNG terminals both, on one hand, for security of supply and peak shaving needs and, on the other hand, for the exploitation of possible commercial opportunities cannot be denied or based on the study of a limited time window. In this paragraph the technical capacity is meant to be the regasification capacity of the terminal which may be different from that of the downstream pipeline infrastructure.
Panigaglia (GNL Italia > Snam Rete Gas)
160 GWh/d
GWh/d
IP Panigaglia (GNL Italia > Snam Rete Gas)
IP Panigaglia (GNL Italia > Snam Rete Gas)
160
140 120 100
140 120 100
40 20 60 80
40 20 60 80
0
0
Apr 2014
Jun 2014
Aug 2014
Oct 2014
Dec 2014
Feb 2015
Apr 2015
Jun 2015
Aug 2015
Oct 2015
Dec 2015
Feb 2016
Apr 2014
Jun 2014
Aug 2014
Oct 2014
Dec 2014
Feb 2015
Apr 2015
Jun 2015
Aug 2015
Oct 2015
Dec 2015
Feb 2016
Booked non interruptible + interruptible Capacity Booked non interruptible Capacity
Flow
Technical Capacity
Average daily
Range
Booked non interruptible + interruptible Capacity
Technical Capacity
Figure 5.63: Panigaglia : Flows and booked capacity vs. technical capacity (monthly)
Figure 5.64: Panigaglia : Flows and booked capacity vs. technical capacity (daily)
78 |
Southern Corridor GRIP 2017–2026