ENTSOG Gas Regional Investment Plan (GRIP) 2017 - 2026 / Southern Corridor / Main Report

Graz

2.2.9 SLOVENIA

Weitendorf

Klagenfurt

SOL

TAG II TAG I

Arnoldstein

Murfeld

TRA-N-389

Cersak v

Tarvisio

Tornyoszentmiklos Pince

TRA-N-361

Bordolano

P

Kidričevo v

S L O V E N I A

TRA-N-112

P

Nagykanizsa

Rogatec

TRA-N-094

TRA-N-108 TRA-N-099

H U

TRA-N-390

LJUBLJANA

TRA-N-261

Ajdovščina

P

Zabok

Gorizia Sempeter

TRA-N-262

TRA-N-354 TRA-N-101 TRA-N-092 TRA-N-093

Trieste

TRA-N-107

Lučko

ZAGREB

Zaule LNG

TRA-N-104

P

Koper

Karlovac

Umag

Porto Viro

Rijeka

Porto Levante Cavarzere

Omisalj

P

Vel. Kladusa

Krk

Lička

TSO PROJECTS

Commissioning (TYNDP 2017)

No. Project

TYNDP Code

Status

TSO/Sponsor

Upgrade of Rogatec interconnection (M1A/1 Interconnection Rogatec)

Advanced Non-FID PCI 6.26.6

1

TRA-N-390

2020

• 2 M6 Ajdovščina – Lucija

TRA-N-365

Non-FID

2019

Non-FID PCI 6.26.2

3 CS Kidričevo, 2 nd phase of upgrade TRA-N-094

2020

M3 pipeline reconstruction from CS Ajdovščina to Šempeter/Gorizia

4

TRA-N-108

Non-FID

2020

Non-FID PCI 6.23

5 R15/1 Pince – Lendava – Kidričevo TRA-N-112

2020

Upgrade of Murfeld/Ceršak interconnection (M1/3 Interconnection Ceršak)

Non-FID PCI 6.26.5

6

TRA-N-389

2020

7 CS Ajdovščina, 1 st phase of upgrade TRA-N-092

Non-FID

2021

8 CS Ajdovščina, 2 nd phase of upgrade TRA-N-093

Non-FID

2022

9 M3/1a Šempeter – Ajdovščina

TRA-N-099

Non-FID

2022

10 M3/1c Kalce – Vodice

TRA-N-261

Non-FID

2022

11 M3/1b Ajdovščina – Kalce

TRA-N-262

Non-FID

2022

12 M8 Kalce – Jelšane

TRA-N-101

Non-FID

2022

13 M6 Interconnection Osp

TRA-N-107

Non-FID

2022

14 R61 Dragonja – Izola

TRA-N-114

Non-FID

2024

• Project not marked on the map

Southern Corridor GRIP 2017–2026 |

31

Made with FlippingBook - Online magazine maker