ENTSOG Gas Regional Investment Plan (GRIP) 2017 - 2026 / Southern Corridor / Main Report

In the PCI infrastructure case few additional projects are considered already in 2020 therefore the changes, compared to the Low case are limited, mainly concerning the sharing between the use of the various entry points and of the UGS. In 2030 more projects are in operation, namely the Eastmed and the Poseidon pipelines. As the supply through Austria is not reduced this allows Italy to increase supply to Switzerland.

Figure 7.3.9: 2020 Low, Transmed disruption

Figure 7.3.10: 2030 Low Transmed disruption

0–50GWh/d

0–80% of capacity 80–99% of capacity 99–100% of capacity 20–40% <20% <40%

0–50GWh/d

0–80% of cap 80–99% of ca 99–100% of c

20–40% <20% <40%

10–30% >20%

10–30% >20%

50–250GWh/d 250–600GWh/d 600–1100GWh/d >1100GWh/d

50–250GWh/d 250–600GWh/d 600–1100GWh/d >1100GWh/d

<30%

<30%

Figure 7.3.11: 2020 PCI Transmed disruption

Figure 7.3.12: 2030 PCI Transmed disruption

0–50GWh/d

0–80% of capacity 80–99% of capacity 99–100% of capacity 20–40% <20% <40% 0–80% of capacity 80–99% of capacity 99–100% of capacity 0–80% of capacity 80–9 % of capacity 9 –10 % of capacity

0–50GWh/d

0–80% of cap 80–99% of ca 99–100% of c

20–40% <20% <40% 20–40% <20% <40%

10–30% >20%

10–30% >20%

50–250GWh/d 250–600GWh/d 600–1100GWh/d >1100GWh/d 0–50GWh/d 50–250GWh/d 250–600GWh/d 600–1100GWh/d >1100GWh/d 0–50GWh/d 50–250GWh/d 250–60 GWh/d 60 –1 0 GWh/d >1 0 GWh/d

50–250GWh/d 250–600GWh/d 600–1100GWh/d >1100GWh/d

Legend

<30%

<30%

10–30% >20%

20–40% <20% <40%

10–30% >20%

<30%

<30%

Southern Corridor GRIP 2017–2026 |

107

Made with FlippingBook - Online magazine maker