ENTSOG Gas Regional Investment Plan (GRIP) 2017 - 2026 / Southern Corridor / Main Report
7.3.1 NON – DISRUPTION CASE
7.3.1.1 Remaining Flexibility and Flows in Non-disruption case
As shown in the following Figures 7.3.1 to 7.3.4, all countries, with the exception of Croatia in the 2030 low infrastructure scenario, have positive Remaining Flexibility in non-disruption cases. Austria, Slovakia, Bulgaria, Bosnia & Herzegovina and Serbia mark the higher values at or near 100% while Croatia has the lower, at the Low infrastructure level case.
Figure 7.3.1: 2020 Low No disruption
Figure 7.3.2: 2030 Low No disruption
0–50GWh/d
0–80% of cap 80–99% of ca 99–100% of c
0–50GWh/d
0–80% of capacity 80–99% of capacity 99–100% of capacity 20–40% <20% <40%
10–30% >20%
20–40% <20% <40%
10–30% >20%
50–250GWh/d 250–600GWh/d 600–1100GWh/d >1100GWh/d
50–250GWh/d 250–600GWh/d 600–1100GWh/d >1100GWh/d
<30%
<30%
Figure 7.3.3: 2020 PCI No disruption
Figure 7.3.4: 2030 PCI No disruption
0–50GWh/d
0–80% of capacity 80–99% of capacity 99–100% of capacity 20–40% <20% <40%
0–50GWh/d
0–80% of cap 80–99% of ca 99–100% of c
20–40% <20% <40%
10–30% >20%
10–30% >20%
50–250GWh/d 250–600GWh/d 600–1100GWh/d >1100GWh/d
50–250GWh/d 250–600GWh/d 600–1100GWh/d >1100GWh/d
<30%
<30%