ENTSOG Gas Regional Investment Plan (GRIP) 2017 - 2026 / Southern Corridor / Main Report

7.3 Security of Supply analysis

In this paragraph we present the Remaining Flexibility of the various countries of the Region under the scenarios combining years, infrastructure level and disrupted source listed in the Table 7.1. The Figures in this paragraph are maps where the colour of each country corresponds to a level of Remaining Flexibility or Disrupted Rate and where flows are represented by arrows: thickness of arrow responds to flow, and utilisation of maximum capacity is indicated by traffic lights.

The remaining flexibility level is indicated by the following colours:

0–50GWh/d

0–80% of capacity 80–99% of capacity 99–100% of capacity

20–40% <20% <40%

10–30% >20%

50–250GWh/d 250–600GWh/d 600–1100GWh/d >1100GWh/d

<30%

and the disruption rate level by the following colours

0–50GWh/d

0–80% of capacity 80–99% of capacity 99–100% of capacity

20–40% <20% <40%

10–30% >20%

50–250GWh/d 250–600GWh/d 600–1100GWh/d >1100GWh/d

<30%

The arrows correspond to the following legend:

0–50GWh/d

0–80% of capacity 80–99% of capacity 99–100% of capacity

20–40% <20% <40%

10–30% >20%

50–250GWh/d 250–600GWh/d 600–1100GWh/d >1100GWh/d

<30%

100 |

Southern Corridor GRIP 2017–2026

Made with FlippingBook - Online magazine maker