ENTSOG GRIP South - Main Report
In France Thanks to the reinforcements at TIGF area, capacity at PIRMIDI have increased on both flow directions. The French National Regulatory Authority aims to create a single gas market in France. To achie ve this goal, GRTgaz South Hub and TIGF hub would first come closer. Amerger between France PEGNorth Hub and PEG SouthHub based on investments is also under study, with a cost benefits analysis.
Infrastructure
FlowDirection
2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
PIRMIDI
FR (TIGF)>FR (GRTgaz South)
80 255 255 255 255 255 255 255 255 485
5
FR (GRTgaz South)>FR (TIGF)
325 395 395 395 395 395 395 395 395 475
Liaison Nord Sud
FR (GRTgaz South)> FR (GRTgaz North) FR (GRTgaz North)> FR (GRTgaz South)
6
230 230 230 230 230 230 merger merger merger merger
230 230 230 230 230 230 merger merger merger merger
n-FID capacity
commercial merger
Table 5.11: FID capacities in France (GWh /d)
Import capacities There aren’t any expecteddevelopments of the importationpipelines.
Infrastructure
FlowDirection
2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
Tarifa
Algeria>SP
444 444 444 444 444 444 444 444 444 444
1
Almeria
Algeria>SP
266 266 266 266 266 266 266 266 266 266
2
Dunkerque
Norway>FR
585 585 585 585 585 585 585 585 585 585
3
Table 5.12: FID capacities Import with non-European third country (GWh /d)
LNGCapacities Anew LNGTerminal will be commissioned inDunkerque in2015, whereas capaci- ties at Fos, Sines andBilbaowill grow.
Infrastructure
FlowDirection
2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
Mugardos
Spain Hub
115
115
115
115
115
115
115
115
115
115
1
Bilbao
Spain Hub
223 223 223 223 223 223 223 223 223 223
2
Barcelona
Spain Hub
544 544 544 544 544 544 544 544 544 544
3
Sagunto
Spain Hub
279 279 279 279 279 279 279 279 279 279
4
Cartagena
Spain Hub
377 377 377 377 377 377 377 377 377 377
5
Huelva
Spain Hub
377 377 377 377 377 377 377 377 377 377
6
Sines
Portugal Hub
213 217 223 229 229 321 321 321 321 321
7
Montoir de Bretagne
France PEG>North Hub
370 370 370 370 370 370 425 425 425 425
8
Fos
France PEG>South Hub
410 410 410 450 450 450 450 785 1112 1112
9
Musel
Spain Hub
223
I
Dunkerque LNG
France Dunkerque cross border area
II
502 502 502 502 502 502 502
France PEG>North Hub
250 250 250 250 250 250 250
n-FID capacity at existing LNG Terminal
Table 5.13: FID capacities LNG (GWh /d)
ENTSOG–GRIPSouth 2013–2022 |
49