ENTSOG GRIP South - Main Report
When comparing thehighdemands of theSouthRegion (1-dayDesignCase, 1-day UniformRisk Situation and14-daysUniformRisk Situation) it can be seen that: \\ The highest values correspond to 1-day DesignCase Situation, that is, the most stressful demand for the gas network. \\ Along the 2013–2022 period the difference between1-day DesignCase Situa- tion and 1-dayUniformRisk Situation remains stable. This difference ismain- ly due to the difference level of risk considered in each country for the estima- tion of theDesignCase.
6,000 5,000 4,000 3,000 2,000 1,000 7,000 8,000 GWh/d
6,000 5,000 4,000 3,000 2,000 1,000 7,000 8,000 GWh/d
1-day UniformRisk Situation
14-days UniformRisk Situation
2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 0
2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 0
France
Portugal
Spain
France
Portugal
Spain
TYNDP 2013–2022
TYNDP 2013–2022
Figure 3.25: High daily demand by country Demand under UniformRisk Situations for the South Region (breakdown by country)
Image courtesy of REN–Gasodutos
ENTSOG–GRIPSouth 2013–2022 |
29
Made with FlippingBook