ENTSOG GRIP South - ANNEX A: Infrastructure Projects
PROJECTEDCAPACITY INCREASES
Interconnection
Capacity (GWh/d)
FromZone
ToZone
Modelled Direction Yes exit
HubPortugal
Badajoz (ES) /CampoMaior (PT)
35,00
HubSpain
DESCRIPTIONOFTHEPROJECT
The project consists of a Compressor Station in themain high pressure pipeline and it aims to increase the capacity of the pipeline section between Sines and Leiria, to enable that higher flow rates can be transported from the LNG Sines Terminal.
COMMENTSABOUTTHEPROJECTFINANCING
Public financing
Private financing
Multilateral financing
| 78
ENTSOG–GRIPSouth 2013–2022AnnexA