ENTSOG GRIP South - ANNEX A: Infrastructure Projects
PROJECTEDCAPACITY INCREASES
Interconnection
Capacity (GWh/d)
FromZone
ToZone
Modelled Direction Yes entry Yes exit
HubSpain HubFrance (PEGTIGF)
LePerthus
230,00 80,00
HubSpain HubFrance (PEGTIGF)
DESCRIPTIONOFTHEPROJECT
In theFrench side, it's composedby a120kmlongpipelinebetween the frontier (near LePerthus) and theCSof Barbaira, the installationof anaditional compressionof 10MWat Barbaira, anda28kmlongpipelinebetween Lupiac andBaran (ArtèreduGascogne).
COMMENTSABOUTTHEPROJECTFINANCING
Public financing
Private financing
Multilateral financing
| 50
ENTSOG–GRIPSouth 2013–2022AnnexA
Made with FlippingBook