ENTSOG GRIP South - ANNEX A: Infrastructure Projects
PROJECTEDCAPACITY INCREASES
InterconnecƟon
Capacity (GWh/d)
FromZone
ToZone
Modelled DirecƟon No exit No entry Yes entry Yes exit
HubFrance (PEGTIGF) HubFrance (PEGTIGF) HubFrance (PEGSouth) HubFrance (PEGSouth)
PIRMIDI
175,00 180,00 185,00 70,00
HubFrance (PEGTIGF) HubFrance (PEGTIGF) HubFrance (PEGSouth) HubFrance (PEGSouth)
DESCRIPTIONOFTHEPROJECT
It's aDN900and58km longpipeline that conects theUGSof LussagnetwithCapƟeuxwithanaddiƟonal compressionat Sauveterre (thathasbeendecided in June)
COMMENTSABOUTTHEPROJECTFINANCING
PublicĮnancing
PrivateĮnancing
MulƟlateral Įnancing
| 46
ENTSOG–GRIPSouth 2013–2022AnnexA
Made with FlippingBook