8.4.2 CASE STUDY 2:

SOUTH-NORTH FLOW (RUSSIAN MINIMIZATION)

When Russian supplies are minimized under average demand situations more gas is needed from other sources. When the SNC projects aimed at creating reverse flow capacity in the corridor would be commis- sioned, additional gas can be delivered from the South towards North and East Europe, adding up to increased flows from the west, and help to compensate for the reduced imports from Russia.

137

171

214 138

CASE DESCRIPTION Year 2023 Demand

Average Day Europe

Supply

Minimization Russia

Infrastructure

FID + non-FID

Figure 8.9: Case study 2: South-North Flow (Russian minimization)

Image courtesy of Fluxys Belgium

96 |

South-North Corridor GRIP 2014–2023