8.3 South-North Corridor Capacities
The main interconnection capacities throughout the Corridor bridging the north and the south of the Region after completion of the considered infrastructure projects that are used in the NeMo simulations are shown below schematically (values as a result of lesser rule and expressed in GWh/d).
BE
262
163
DEn
358
607
FRn
CH
230
100
429
633
IT
Figure 8.7: Schematic representation of the South-North Corridor and related technical capacities
94 |
South-North Corridor GRIP 2014–2023