ENTSOG GRIP SNC 2014-2023

8.3 South-North Corridor Capacities

The main interconnection capacities throughout the Corridor bridging the north and the south of the Region after completion of the considered infrastructure projects that are used in the NeMo simulations are shown below schematically (values as a result of lesser rule and expressed in GWh/d).

BE

262

163

DEn

358

607

FRn

CH

230

100

429

633

IT

Figure 8.7: Schematic representation of the South-North Corridor and related technical capacities

94 |

South-North Corridor GRIP 2014–2023

Made with