6.3.1.1 Support to the North West market
MONACO II MEGAL The construction of the Cremona – Sergnano pipeline will also connect the new storage field of Bordolano, with projected 1.2bcm of working gas, to the national network. The completion of the first project phase will ensure the possibility to export up to 5MSm³/d (equivalent to around 54GWh/d) at Passo Gries toward Switzerland. Leonberg Haiming2-7F Oberkappel 21 The first phase consists in expanding the capacity of the line from the east to the west of the Po Valley, through the construction of pipelines in Cremona–Sergnano, Poggio Renatico – Cremona, and Zimella – Cervignano as well as a new node in Sergnano. It also includes upgrades to the compressors at Istrana and Masera, as well as work on the measurement equipment at Masera which enables management of the exit flows at Passo Gries and Tarvisio. Some of the work included in the project has already been completed. The Cremona– Sergnano pipeline and the upgrading of the compression plant in Istrana have been in operation since the end of 2011. The work on the compressors and measurement equipment at Masera were commissioned in July 2013, and the Poggio Renatico– Cremona pipeline was commissioned in October 2013. The construction of new pipelines also allows the replacement of the existing pipelines: Minerbio – Cremona, Cremona – Sergnano, Zimella – Sergnano and Sergnano – Cervignano, for a total extension of approximately 315 km, which im- proves the overall transmission system and reduces potential impacts in the urban- ized area of Emilia, Veneto and Lombardy. Stuttgart
Karlsruhe
VOB
NORD SCHWARZWALD
LEITUNG
Au amRhein
Kralice
Veselí nad Lužnicí
Hostim
TENP
Břeclav
Reinthal
WAG
BACI
61
Penta
West
MONACO I
6
München
Linz
Haidach
46
Baumgarten
23
Wolfersberg
62
Burghausen
H
Fallentor
Inzenham
Wallbach
VIENNA
Überackern
69
28
Thayngen
Oltingue Rodersdorf
Kittsee
Salzburg
Lindau Leiblach
31
Kiefersfelden
Pfronten
CEGH
414
4
24
A U S T R I A
Basel
Zürich
Mos
LIECHT.
BERN
Innsbruck
TAG
TGL
Graz
S W I T Z E R L A N D
Weitendorf
eva 68
Klagenfurt
Arnoldstein
27
Griespass
TAG II TAG I
SOL
26
25
PassoGries
Murfeld Cersak v
South Stream
Tarvisio
Jura
Masera
Trento
Rogatec
Bizzarone
30
66
Sempeter
29
LJUBLJANA
Istrana
Gorizia
Sergnano
ZAGREB
Milano
S L O V E N I A
Zimella
Lučko
Trieste
Venezia
Porto Levante Cavarzere
Torino
Cervignano
Karlovac
Umag Rijeka
Poggio R.
307
C R O A T I A
Krk
Omisalj
Porto
Viro
Vodnjan
Krk
Pula
Ravenna
Bologna
Banja
Genova
Minerbio
I T A L Y
Gospič
B H E R Z
Panigaglia
Nice
306
SanMarino
118
Firenze
Zadar
S.M.
FalconaraMarittima LNG
OLTOffshore LNGToscana
317
Knin
L i g u r i a n S e a
Benkovac
Ancona
Livorno
PortoRecanati offshore
Figure 6.3: Support for the North West market
411
Rosignano offshore
Split A d r i a t i c S e a
Piombino
Perugia
PSV
ADRIATICA PIPELINE
Bastia
Ploč
South-North Corridor GRIP 2014–2023 C O R S I C A