ENTSOG GRIP SNC 2014-2023

Pipeline

before 2017 between 2017 and 2020 after 2020

Reverse flow

before 2017 between 2017 and 2020 after 2020

Figure 5.2: Graphical representation of pipeline PCIs, with indication of reverse flow projects; (Source: Elaboration on European Commission publication, Energy DG Interactive Map (http://ec.europa.eu/energy/infrastructure/transparency_platform/map-viewer/))

The impact of the commissioning of PCIs infrastructure in bridging gas market hubs is particularly relevant considering the fact that the Region stretches along a corri- dor that, due to the historical evolution of national market and related gas sources, is not yet deployed to its full potential.

Image courtesy of Snam Rete Gas

56 |

South-North Corridor GRIP 2014–2023