ENTSOG GRIP SNC 2014-2023

C. MEDELSHEIM/ OBERGAILBACH (DE/FR)

This IP connects the German NCG with the French PEG Nord. It was used at its maximum technical capacity on March 2013, when German hubs were the most attractive markets of the Region, showing a dynamic similar to the one detected at Eynatten.

0.2 0.4 0.6 0.8 1.0 1.2 1.4 €/MWh

800 GWh/d

IP Medelsheim / Obergailbach DE > FR

600

400

200

-0.2 0

0

Jan

Mar Feb Apr May Jun Jul

Aug Sep Oct Nov Dec Jan

Mar Feb Apr May Jun Jul

Aug Sep Oct Nov Dec

2012

2013

Daily Flow Range

Technical Firm Capacity Booked Firm Capacity

Price Spread PEG Nord – NCG Average Monthly Flow

Figure 3.17: Technical capacities, booked capacities, gas flows and price spreads at Medelsheim/Obergailbach IP (DE/FR) (Source: ENTSOG Capacity Map 2014, GRTgaz, OGE and GRTgaz Deutschland)

40 |

South-North Corridor GRIP 2014–2023

Made with