ENTSOG GRIP SNC 2014-2023
Project Promoter
Name
TYNDP Code
FID Status
Commissioning
GRTgaz (continued)
Val de Saône project
TRA-N-043
Non-FID
2018
New interconnection to Luxembourg
TRA-N-044
Non-FID
2018
Reverse capacity from CH to FR at Oltingue
TRA-N-045
Non-FID
2017
Exit capacity increase to CH at Oltingue
TRA-N-046
Non-FID
2022
TRA-N-047
Non-FID
2020
Reverse capacity from France to Germany at Obergailbach
TRA-N-048
Non-FID
2018
Transmission system developments for Montoir LNG terminal expansion at 12,5 bcm – 1
Arc Lyonnais pipeline
TRA-N-253
Non-FID
2019
Connection of the Fos faster LNG new terminal
TRA-N-254
Non-FID
2019
Fos Tonkin LNG expansion
TRA-N-255
Non-FID
2019
Iberian-French corridor: Eastern Axis-Midcat Project (CS Montpellier and CS Saint Martin de Crau)
TRA-N-256
Non-FID
2021
New line Between Chemery and Dierrey
TRA-N-257
Non-FID
2021
TRA-N-258
Non-FID
2021
Transmission system developments for Montoir LNG terminal expansion at 16,5 bcm – 2
Transmission system developments for Fosmax (Cavaou) LNG expansion
TRA-N-269
Non-FID
2020
IGI Poseidon S.A.
Poseidon Pipeline
TRA-N-010
Non-FID
2019
Open Grid Europe GmbH
System enhancements, including the connection of gas-fired power plants, storages and the integration of power to gas facilities
TRA-N-243
Non-FID
2020
Stepwise change-over to physical H-gas operation of L-gas networks
TRA-N-244
Non-FID
2020
PRD-N-301
Non-FID
2016
Project study on the integration of Power to Gas (PtG) facilities into the gas transmission system
Snam Rete Gas S.p.A.
Support for the North West market
TRA-F-213
FID
2016
Support for the North West market and bidirectional cross-border flows
TRA-F-214
FID
2018
Development for new imports from the South
TRA-N-007
Non-FID
2019
Import developments from North-East
TRA-N-008
Non-FID
2021
Additional Southern Developments
TRA-N-009
Non-FID
2021
terranets bw GmbH
Nordschwarzwaldleitung
TRA-F-228
FID
2015
TIGF
Girland - Artère de Guyenne Phase B
TRA-F-250
FID
2013
TRA-F-251
FID
2015
Artère de l'Adour (former Euskadour) (FR – ES interconnection)
Iberian – French corridor: Eastern Axis-Midcat Project
TRA-N-252
Non-FID
2021
Trans-Adriatic Pipeline AG
Trans Adriatic Pipeline
TRA-N-051
FID
2019
Table 2.2: Transmission projects, including compressor stations, detailed according to project promoter
South-North Corridor GRIP 2014–2023 |
21