ENTSOG GRIP SNC 2014-2023

6.6 Oltingue IP positioning and locations foreseen for investments at Morelmaison . . . . . . . . . . . . . . . . . 67 6.7 TENP-system flow reversal project and new bidirectional interconnection pipeline initiative (Bretella), in combination with NOS and Zeelink projects . . . . . . . . . . . . . . . . . . . 68 7.1 France – Location of projects, identified by their ENTSOG TYNDP code . . 75 7.2 Belgium – Location of projects, identified by their ENTSOG TYNDP code . . 77 7.3 Germany – Location of projects, identified by their ENTSOG TYNDP code . 81 7.4 Italy – Location of projects, identified by their ENTSOG TYNDP code . . . 83 7.5 Other Snam Rete Gas development projects . . . . . . . . . . . . 84 7.6 Traditional and potential sources of gas to Europe (103 bcm) . . . . . . 85 7.7 Azeri gas trip from Shah-Deniz to Italy . . . . . . . . . . . . . . 86 7.8 Zoom on TAP schematic representation . . . . . . . . . . . . . . 86 7.9 GALSI Project . . . . . . . . . . . . . . . . . . . . . . . . 87 7.10 ITG Project . . . . . . . . . . . . . . . . . . . . . . . . . 87 8.1 North West Region under peak demand and rest of Europe under average demand conditions . . . . . . . . . . 91 8.2 Mediterranean Region under peak demand and rest of Europe under average demand conditions . . . . . . . . . . 91 8.3 Central Eastern Europe Region under peak demand and rest of Europe under average demand conditions . . . . . . . . . . 91 8.4 Comparison of the statistical historical (period 2010 – 2012) distribution of minimum demand days per month in the three macro-areas . . . . . . . . . . . . . . . . . . . 91 8.5 Comparison of the statistical historical (period 2010 – 2012) distribution of maximum demand days per month in the three macro-areas . . . . . . . . . . . . . . . . . . . 92 8.6 Historical aggregated maximum gas demand for the three different macro-areas . . . . . . . . . . . . . . . . 92 8.7 Schematic representation of the South-North Corridor and related technical capacities . . . . . . . . . . . . . . . . . . 94 8.8 Case study 1: North-South Flow . . . . . . . . . . . . . . . . . 95 8.9 Case study 2: South-North Flow (Russian minimization) . . . . . . . . 96 8.10 Case study 3: South-North Flow (LNG minimization) . . . . . . . . . 97 8.12 Modelled determination of supply sources of gas for Germany . . . . . . 98

South-North Corridor GRIP 2014–2023 |

103

Made with