ENTSOG GRIP SC 2017-2026 / Annex B - Project Information
Current TYNDP : TYNDP 2017 - Annex A
Page 33 of 620
Sponsors BEH EAD
General Information
50%
Promoter Operator
ICGB a.d. ICGB a.d. Bulgaria Planned
IGI Poseidon
50%
Host Country
Status
Website
Project's URL
Publication Approval Status
Approved
NDP and PCI Information
Schedule
Start Date
End Date 12/2009 07/2009 03/2016 09/2016 11/2016 12/2016 12/2015 12/2018
Third-Party Access Regime
Pre-Feasibility
Considered TPA Regime Considered Tariff Regime Applied for Exemption
Yes (Included in both the TYNDPs of Greece and Bulgaria)
Not Applicable Not Applicable
Part of NDP
Feasibility
05/2009 08/2008
NDP Number
not applicable
FEED
Yes
Market Test Permitting
Exemption Granted
Not Yet
Currently PCI
Yes (6.8.1)
08/2010
Exemption in entry direction Exemption in exit direction
Supply Contracts
0.00% 0.00%
CBCA Decision Market Survey
No
FID
Not Relevant (no CBCA decision)
Construction
03/2017
Commissioning
2018
2021
PCI Details
Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation prior to the commissioning of the project, Project concerns investment in reverse flow capacity
PCI Benefits
General Criteria Fulfilled Specific Criteria Fulfilled
Yes
Competition, Market Integration, Security of Supply, Sustainability Specific Criteria Fulfilled Comments As regional gas interconnector, IGB will bring benefits on all criteria, an in particular will secure new gas sources and market integration in a SEE region, suffering from a high level of dependcy on single source of imports and lack of regional cross-border gas interconnections.
Time Schedule
Grant Obtention Date Delay Since Last TYNDP
2 years
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Southern Corridor GRIP 2017–2026 Annex B |
49