ENTSOG GRIP SC 2017-2026 / Annex B - Project Information

Current TYNDP : TYNDP 2017 - Annex A

Page 19 of 620

NDP and PCI Information

Schedule

Start Date

End Date 02/2011 12/2012 05/2017 08/2016 04/2017 12/2012 12/2018

Third-Party Access Regime

Pre-Feasibility Feasibility FEED Market Test Permitting

Considered TPA Regime Considered Tariff Regime Applied for Exemption

Yes (2016-2025 Ten-year network development plan of BTG)

Regulated Regulated

Part of NDP

12/2011

NDP Number

Sectin 5.2 (5.2.3)

No No

Exemption Granted

Currently PCI

Yes (6.10.)

Exemption in entry direction Exemption in exit direction

Supply Contracts

0.00% 0.00%

CBCA Decision Market Survey

No

FID

Not Relevant (no CBCA decision)

Construction

05/2017

Commissioning

2018

2018

Pipelines and Compressor Stations Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

Bulgarian territory Serbian territory

1.8 bcm/y maximum capacity 1.8 bcm/y maximum capacity

700 700

62

108 170

Total

PCI Details

Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation prior to the commissioning of the project, Project aims at fulfilling the infrastructure standard (N-1) rule at regional level in accordance with Article 6(3) of Regulation EU, Project concerns investment in reverse flow capacity, Project aims at supplying directly or indirectly at least two Member States

PCI Benefits

General Criteria Fulfilled Specific Criteria Fulfilled

Yes

Competition, Market Integration, Security of Supply, Sustainability

Specific Criteria Fulfilled Comments

Expected Gas Sourcing

Caspian Region, LNG (GR)

Benefits

Main Driver

Others

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM