ENTSOG GRIP SC 2017-2026 / Annex B - Project Information

Current TYNDP : TYNDP 2017 - Annex A

Page 45 of 620

NDP and PCI Information

Schedule

Start Date

End Date

Third-Party Access Regime

Pre-Feasibility Feasibility FEED Market Test

Considered TPA Regime Considered Tariff Regime Applied for Exemption

Yes (2016-2025 Ten-year network development plan of BTG)

Regulated Regulated

Part of NDP

NDP Number

Section 5.1. (5.1.1)

No No

Exemption Granted

05/2017

Currently PCI

Yes (6.25.4)

Permitting Supply Contracts FID Construction Commissioning

Exemption in entry direction Exemption in exit direction

0.00% 0.00%

CBCA Decision Market Survey

No

Not Relevant (no CBCA decision)

06/2022

2022

2022

Pipelines and Compressor Stations Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

Replacement of 20 km of gas pipelines (2x10km), DN 1000 in the section CS Strandja – a new IP with Turkey. new looping and additional power to existing compressior station

CS Strandja – a new IP with Turkey.

1,000

20

1,200

50

10

Looping CS Provadia – Rupcha village

Total

70

10

PCI Details

PCI Benefits General Criteria Fulfilled Specific Criteria Fulfilled

Yes

Competition, Market Integration, Security of Supply, Sustainability

Specific Criteria Fulfilled Comments

Expected Gas Sourcing Caspian Region, Russia, LNG (), Southern gas corridor gas sources; European gas hubs; Black sea shelf gas; Domestic production;

Benefits

Main Driver

Others

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Southern Corridor GRIP 2017–2026 Annex B | 41

Made with FlippingBook - Online catalogs